The gas terminal

Triangle bottom right

Safe solution

Robust construction in a carefully selected location

The new gas terminal will be ready in late 2022/early 2023. Symbolising a bright, sustainable future for both steel manufacturing and sea transports, our new landmark will be placed at a carefully chosen spot.

Rising 45 metres, the terminal has a sturdy construction of steel and concrete. Well proven building methods and material will ensure safe handling directly to train, trucks, and vessels.

A sustainable landmark

Height: 45 m

Diameter: 30 m

Capacity: approx 30 000 ㎥

Planned commissioning: 2022-2023

1

Inner tank of steel and 9 % nickel

2

Insulation of perlite (non-combustible, 100 % natural material) to keep the gas chilled down to -160 ˚C

3

Gas pipes for bunkering and outloading

4

Outer tank of steel-covered concrete

5

The inside of the tank has submerged pumps for transporting the gas to the evaporators

6

The tanks stands on a base of 260 seismic insulators

Smooth transition

The first step

While waiting for all granted permissions needed to start the building procedure, we are setting up a temporary, much smaller and simpler so called step 1 terminal. This terminal will be ready to operate already in May 2020.

A standardised thermos

1

Tank with double steel walls

2

Evaporators

3

Gas pipeline

New methods, new fuels

Caring for people and environment

The new gas terminal